Warm, sunny, dry, 24. Moon: Full
Stefan, Barrie, Tewe, Darren
Big tor, brush-cutting and mulch collecting day. Were able to catch up a bit after all the rain in the last weeks and especially over the weekend.
Top areas, eat, west, figtree paddock collected. Brush-cut east top area and look-out.
Terraces: flowerbeds weeded and prepared for planting.
Alf Massud sculpture installed on east, top paddock.
Stefan, Tewe, Barry, Darrin
Warm, overcast, a storm at noon. Moon: waxing, 75% of Full.
Tulsi propagation, flower propagation.
Toro, brush-cutting, major clean-up around tractor shed.
Olive hill, hoop pine reserve, east,top area.
Tewe, Stefan, Barry, Darrin
Rainy, warm, 22, had to stop work at lunch time because of heavy rain.
Brush-cut and prepared north/western area, teashed, lotusdam, maccas, citrus etc.
Heavy rain for the last 4 days. No farm work was possible on Tuesday.
Stefan, Tewe, Barry, Stacey
Warm, overcast, 23. Moon: waxing, 13% of Full
Massive brush-cutting and toro day to catch up with the growth after the rain.West and east, top areas and gullies.
Stefan, Barrie, Tewe, Stacey
Overcast, little rain overnight, warm. 22, Moon, waning, 15% of Full
Demolished old shed and big clean up of tool shed. Limed pecans and olives and top eastern paddocks.
Brush-cut eastern gully, 3/4 done.
Stefan, Barrie, Tewe, Stacey
Warm, overcast with rain late afternoon. 22. Moon waning, 23% of Full
Major toro, brush-cutting day, east and west.
Re-potting of palms.
terrace garden maintenance.
| Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|
| << < | Current | > >> | ||||
| 1 | 2 | 3 | 4 | 5 | ||
| 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 13 | 14 | 15 | 16 | 17 | 18 | 19 |
| 20 | 21 | 22 | 23 | 24 | 25 | 26 |
| 27 | 28 | 29 | 30 | 31 | ||